Construction Site Safety Inspection Report
Project Details
- Project Name: [Insert project name]
- Client: [Insert client name]
- Contractor: [Insert contractor name]
- CDB Number: [Insert CDB number]
- Award Amount: [Insert award amount in Nu.]
Occupational Health and Safety (OHS) Management
The site is well-organized, with a clear OHS policy in place. The site has designated personnel responsible for overseeing OHS matters.
Fire Extinguishing Equipment
The site has fire extinguishers installed at regular intervals, and personnel have been trained on their use.
First Aid Box
A first aid box is available on-site, with basic medical supplies.
Personal Protective Equipment (PPE)
The site implements PPE as per BSB/ISO/ISI standards. The following PPE is provided:
- Safety Helmets: [Insert number] available
- Safety Boots: [Insert number] available
- Reflective Vest/Jackets: [Insert number] available
- Goggles: [Insert number] available
- Welding Mask/Goggles: [Insert number] available
- Dust Mask: [Insert number] available
- Safety Harness/Belts: [Insert number] available
- Safety Gloves: [Insert number] available
- Ear Plugs: [Insert number] available
Human Resources and Labour
- Total Bhutanese labourers on-site: [Insert number]
- Total non-Bhutanese labourers on-site: [Insert number]
- Number of interns on-site: [Insert number]
- Number of VTI graduates on-site: [Insert number]
Sub-Contractor/Specialized Trade
Yes, the site has sub-contractors and specialized trades engaged in specific tasks.
Engineer Details
- Engineer (Name/CID): [Insert name and CID]
- Site Supervisor (Name/CID): [Insert name and CID]
- Others (Name/CID): [Insert name and CID]
Monitoring Guidelines 2020
The site is monitored regularly to ensure compliance with safety regulations.
Performance Score Table
Sl/No | Description | Total Score | Score Obtained |
---|---|---|---|
1 | On-time completion | 30 | [Insert score] |
2 | Quality of execution | 70 | [Insert score] |
Grand Total | 100 | [Insert total score] |
Average Performance Scoring Form
The contractor’s performance is evaluated based on its previous work, with a maximum score of 100.
Guideline for Average Performance Score
- On-time completion (30%)
- Quality of execution (70%)
Conclusion
Based on the inspection report, the site appears to be well-managed in terms of OHS and PPE implementation. However, further monitoring is necessary to ensure compliance with safety regulations.
Recommendations
- [Insert recommendations for improvement]
Date of inspection: [Insert date]