Connections in Construction Permits: A Study in Cabo Verde

=====================================================

In recent years, the government of Cabo Verde has made significant strides to streamline the process of obtaining construction permits. According to the Doing Business 2020 report, the country has scored an impressive 74.6 out of 100 in dealing with construction permits, ranking it 50th globally.

Key Connections Driving Improvement

  • The average water use and wastewater flow for new constructions are estimated to be 662 liters (175 gallons) and 568 liters (150 gallons) per day, respectively.
  • A constant level of water demand and wastewater flow throughout the year has simplified the process.
  • Construction permits can be obtained through a seamless online system.

Time and Cost Savings

  • The time taken to complete procedures has decreased from 101 days in 2018/19 to just 15.1 days in 2020.
  • The cost of obtaining construction permits has also decreased significantly, from 145.4% of warehouse value to 1% in the same period.

Key Procedures

  • Request and obtainment of a plot certificate
  • Property title and architectural plans
  • Submission and approval of structural plans
  • Receipt of a pre-construction visit from the Municipality

Costs and Measures to Reduce Bureaucratic Hurdles

  • The average cost of obtaining construction permits in Cabo Verde is CVE 75,000 (approximately USD 900), with costs varying depending on the size and type of project.
  • A 15-day time limit for approving architectural plans has been implemented.

Conclusion

The report suggests that the connections in construction permits in Cabo Verde have significantly improved, making it an attractive destination for investors and developers. The government’s efforts to streamline the process and reduce bureaucratic hurdles have contributed to this improvement, making it easier and more cost-effective for businesses to obtain construction permits.